Moisture-resistant construction
Appropriate boards and construction details selected for the room and wet-area conditions.
Bolf UG coordinates the interior construction and finishing elements of bathroom renovation, including drywall adjustments, surface preparation, waterproofing, tiling and final details within the agreed scope.
Demolition, plumbing, electrical work, substrate preparation, sealing, tiling and finishing must be sequenced correctly. The offer should clearly state which work is performed by Bolf UG and which work is handled by specialist partners or the client.
Removal of agreed finishes and preparation of walls and floors for the new construction.
Moisture-appropriate linings, service boxing, niches or ceiling adjustments where included.
Sealing of defined wet areas and installation of wall and floor tiles according to the approved layout.
Grout, sealant joints, surface finishing and a final review of the agreed work.
Typical products we specify for this work — chosen for finish quality, durability, and clean results.
Appropriate boards and construction details selected for the room and wet-area conditions.
Compatible primer, sealing membrane, tapes and collars used as a complete system where required.
Tiles, edge profiles and transitions planned according to the room layout and selected finish.
Joint colours and elastic sealant locations agreed before final completion. Gallery intro
Only advertise this when qualified and legally permitted specialists are part of the confirmed project scope. Otherwise state clearly that plumbing and electrical work must be completed by the appropriate specialist contractor.
The duration depends on demolition, drying times, trade coordination, material availability and the extent of layout changes. A schedule can be prepared only after the full scope is known.
Usually not during the main renovation stages. Access and alternative arrangements should be discussed before the start date.